Plant Electrical System — Interactive SLD & Control Philosophy

Project control philosophy - Intertripping, load shedding, ATS and synchronization

Developed for JFCF
REVIEW SIMULATION ONLY - protection settings, selectivity and switching sequences shall be validated against approved project documents.
SYSTEM SCENARIOS

Controls

REV 00
INTERTRIPPING / SOURCES
LOAD SHEDDING
ATS / SECONDARY SELECTIVE
Source data: ratings and rules from control philosophy. Load MW values are simulated.
Primary LS: predictive reserve calculation.
Backup LS: independent 81U/81R; thresholds and delays per transient-stability study.
Essential LS: active only on EDG supply.
ATS: transfer after delay, blocked on electrical fault/86/unavailable breaker.
ANONYMISED ELECTRICAL NETWORK
Normal interconnected operation
MANUAL
220 kV DOUBLE BUS
AUXILIARY GENERATIONAuxiliary generation · project-defined rating
HYDRAULIC GENERATORS4 × 1.4 MW LNG + 4 × 1.3 MW MR
66 kV DISTRIBUTION BUS
POWER BALANCE
SIMULATED LOAD VALUES - NOT LIVE PLANT MEASUREMENTS
33 kV TIES OPEN
11/6.6 kV TIES OPEN
415 V TIES OPEN
ESSENTIAL TIE OPEN
ESSENTIAL BUSNormal source selected
EDG SYSTEMMultiple sets · project-defined rating · MODEL RATING

Capacity comparison only. Load pickup and transients are not modeled. Colors show breaker/connection state, not served demand.

EPC READY · EDG BREAKERS OPEN
SYNCHRONIZATION IN PROGRESS
Click a source or coupler to OPEN/CLOSE · Red = closed · Green = open · Amber = synchronization in progress
ELECTRICAL SYSTEMS

Control Philosophy & Power Distribution

Philosophie de contrôle et distribution électrique

JFCF
Technical explanation · Explication technique
JFCF · TECHNICAL LEARNING

Understand the system.
Understand its limits.

Comprendre le système. Comprendre ses limites.

© 2026 JFCF
Training content · All rights reserved
© 2026 JFCF
Educational simulation only; never an operating or installation procedure. · Corrected copy 2026-10-03 · 0be644a7